Three storey new-build care home, on a brown-field site, comprising load-bearing masonry construction, with pre-cast concrete floors, and timber roof trusses.
Drainage is heavily attenuated to reduce flows from the site. As part of the works we presented to Anglian Water that the former connection from the site should have been adopted under the ’Transfer of Sewers’, a point that was eventually accepted providing a connection point for both foul and surface water flows.