Our services comprised the drainage network design working with the Architect and Wakefield MDC’s drainage team to ensure a SUDs approach was taken from concept stage.
SUDs systems used to the school developments to provide a number of treatment trains included filtration trenches, soakaways and pervious pavements as well as more traditional systems of piped drainage to adopted network.
Dudleys also provided the external works design to playgrounds and car parking together obtaining Section 104 Statutory Authority adoptions.