Unilever

  • Unilever
  • Coal Road, Leeds
  • Various Separate Projects Completed

Project Overview

Dudleys have provided Structural Engineering design services to Unilever’s Leeds site for ten years, all working within the confines of existing plant.

Dudleys’ involvement has included design around live equipment; gantries, plant supports, modifications to existing conveyor systems with removal of columns and supports, plinths, foundations, floor slabs for plant, retaining walls to bunded material all provided through designs direct to Contractor onto engineering drawings with reinforced concrete, groundworks, levels and drainage systems. All the Engineering works take place within live production environments.